Constructed based on UpTime Tier II+ Data Center specification.
Adopted green technology for gas emission in fire system, air conditioning system.
Located in a building which certified by green compliance (green Mark Compliance) including the use of double glass of technology for energy efficiency.
Fully Raised Floor with 500 mm height heavy duty raised flooring system.
Open Ceiling system for separate power (under raise floor) and Data (Ceiling) cabling system.
Dual Electrical Power Source to rack for redundancy.
N+1 UPS System with Battery Backup Solution and supported by a Robust Generator set.
N+1 Precision Air Conditioning System with New Cooling Methodology through hot & cold aisle for effective cooling solution.